EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Voltar-S21
-
Listing for Category : research
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (835)
Research
- (9)
Workshop
- (16)
Empennage
- (6)
Fuselage
- (182)
Firewall
- (19)
Tail Feathers
- (70)
Wings
- (191)
Controls
- (9)
Avionics
- (105)
Lighting
- (3)
Instrument Panel
- (72)
Landing Gear
- (11)
Engine
- (93)
-
Spinner, Prop and Oil
-
Cowling
-
Oil Door
-
Oil Door
-
Oil Door
-
Oil Door
-
Oil Door
-
Cowling Caulking
-
Cowling
-
Cowling Details
-
Cowling Details
-
Cowling
-
Cowling Fasteners
-
Cowling Fasteners
-
Completed Engine...
-
Fuse Bottom Fairing
-
EGT CHT Wiring,...
-
Probe Wiring
-
Exhaust Hanging
-
Exhaust Hangers
-
Exhaust
-
Blast Tubes
-
Baffle RTV
-
Baffle Closeout
-
Baffle Filler Pieces
-
Baffle Fill-In
-
Baffle Riveting
-
Baffle Backplates
-
Baffles Again
-
Baffle Tweaks
-
Air Box Baffles
-
Baffle Backing Strips
-
Baffle Details
-
Baffle Convergence
-
Baffle Convergene
-
Baffle Mods
-
Baffle Adjustments
-
Baffle Rework
-
Inlet Seals
-
Baffle Redux
-
Baffles
-
Inlet Ramp Baffles
-
Inlet Ramp Baffle Mods
-
Inlet Ramp
-
Inlet Ramps
-
Inlet Ramps
-
Inlet Ramps
-
Inlet Ramps
-
Baffle Seals
-
Baffle Seals
-
Baffle Seals
-
Baffle Seals
-
Baffle Seals
-
Boot Cowl
-
Sealing Firewall...
-
Sealing Firewall...
-
Wire Grooming
-
Alternator Install
-
Ignition Wires
-
FWF Wiring
-
FWF Wiring
-
Wire Grooming and...
-
FWF Wiring and Hoses
-
FWF Wiring
-
FWF Wiring
-
PMAG Wiring
-
Trimming Engine Cowl
-
Cowl Fitup
-
Baffles and Prop
-
Aft Baffles
-
Baffles
-
Bafffle Mods
-
Baffles
-
Baffles
-
Baffle Air Dams
-
Baffling
-
PMAG and Baffles
-
Airbox Install
-
Fabricated Alternate...
-
Air Box
-
MAP Plumbing
-
Rigging Engine Controls
-
Rerigging Throttle...
-
Throttle Cable
-
Servo Mount
-
Sensor Install
-
Sensor Install
-
Engine Installation
-
Engine Mount
-
Engine Mount Mod
-
Engine Arrives
-
FWF Accessories
-
Installed Engine Mount
Propeller
- (5)
Fuel System
- (6)
Interior Finish
- (35)
Paint / Decals
Inspection
- (2)
Tools
Suggestions
- (1)
Builder Name:
Vern Little
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
2341.9
Start/Last Date:
Mar 06, 2018 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=Voltar-S21
Home or Last Project Picture
Mar 06, 2025
About
Category: Research
Here I am with my Harmon Rocket II, Voltar. Don't let this confuse you, because I am building an S-21!
Below is my RV-9A flirting with the Rocket.
Voltar.jpeg
VRL.jpeg
Feb 01, 2024
Additional Parts
- (.1 hour)
Category: Research
Ordering extra rivets
Jul 05, 2023
Baffle Seals
- (3.5 hours)
Category: Research
Fitting baffle seals. Need to cut oil filler door to allow for detailed fitting.
Jul 04, 2023
Baffle Seals
- (2.0 hours)
Category: Research
Fabricated more baffle seal backing strips and started to fit flexible seals.
Jun 29, 2023
Putting thing in Perspective
Category: Research
Doing some research on Baffling while watching TV… my nephew was just drafted by the NHL Anaheim Ducks! Hockey has always been my 3rd rail, after Electronics and Airplanes. Yeah! Nico Myatovic. First player in the second round, #33 overall.
Nico Myatovic
Apr 02, 2023
On hold
Category: Research
Project temporarily on hold.
Nov 01, 2022
Wiring Mods
- (3 hours)
Category: Research
Fabricated wiring harnesses for downtube power/data jacks. This will allow devices to be mounted in the line of sight, such as an OnSpeed display.
Oct 31, 2022
Downed Tools
Category: Research
Project on hold... waiting for an engine and some parts for options/upgrades to the kit.
The photos show a design I did in 2022... and another design from 1982.
2022 - huVVer-AVI
1982 - 8ch LS/GS Trunk
Mar 06, 2021
Three years!
Category: Research
Three years and counting.....
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.